From template to fit

The order
of a good fit.

Choose the material first. We schedule the template when the cabinets and fixtures are ready, then agree on an installation date.

Your project timeline

  1. First / Quote

    Bring the rough plan.

    We aim to prepare an initial quote within two business days of receiving dimensions and material choices. Special-order materials can take longer to source.

  2. Next / Template

    Measure the room as it is.

    Cabinets must be fixed, level and in their final position. Have the actual sink, faucet and cooktop on site. We agree on seams, overhangs, support and backsplash outlet positions before cutting.

  3. Then / Fabricate

    Leave room for the workshop.

    After the approved template and material arrival, allow 10–15 business days for stone or solid surface, or 5–10 business days for laminate. We confirm the date for your specific order.

  4. Finally / Install

    Keep the room clear.

    Most straightforward kitchens take one day. Clear a path and empty the lower cabinets. Old-counter removal is arranged separately. Keep children and pets out of the work area.

    Plumbing is separate. Plan reconnection no earlier than the following day, and follow the adhesive cure instructions we leave before using the sink.

Care basics

A little everyday care.

Wipe gently

Use a soft cloth, mild soap and water. Rinse and dry. Avoid abrasive pads and harsh cleaners; follow the care sheet for your chosen material.

Use a buffer

Put hot cookware on a trivet and food on a cutting board. Do not stand or sit on unsupported edges.

Watch the seams

Wipe spills promptly, especially at laminate seams and sink edges. Follow the sealing schedule supplied for natural stone.

A new surface starts with a few numbers.

A rough sketch is enough for the first conversation.

Request a quote